導(dǎo)航:全球石油化工網(wǎng) >> 資訊頻道 >> 技術(shù)裝備

貝克休斯多段壓裂技術(shù)新應(yīng)用(英)

[加入收藏][字號: ] [時(shí)間:2009-11-10 全球石油網(wǎng) 關(guān)注度:0]
摘要:簡介:貝克休斯最近宣布,利用其Frac-Point EX 多段壓裂系統(tǒng)在威廉森頁巖盆地成功進(jìn)行了一次24段完井作業(yè)。該項(xiàng)目是球閥式隔離層帶項(xiàng)目中段數(shù)最多的項(xiàng)目之一。 Baker Hughes recently announced ...
簡介:貝克休斯最近宣布,利用其Frac-Point EX 多段壓裂系統(tǒng)在威廉森頁巖盆地成功進(jìn)行了一次24段完井作業(yè)。該項(xiàng)目是球閥式隔離層帶項(xiàng)目中段數(shù)最多的項(xiàng)目之一。


Baker Hughes recently announced the successful running of a 24-stage completion in the Williston Basin of the Bakken shale using its Frac-Point EX multistage fracturing system (Frac-Point EX). The project represents one of the largest number of stages ever run using a ball/sleeve method for isolation.

The original Frac-Point system was designed to allow operators to pinpoint fluid placement and volume during openhole fracturing operations, while eliminating the costs and complexities of cementing and perforating. Deployed as a one-trip installation and set in place by applying hydraulic pressure, the cost-effective system provides openhole isolation between zones, zone lobes, or fault lines so that fracture fluid is delivered where needed to maximize its effect.

The Frac-Point EX extends the Frac-Point system’s capability to 24 stages. Baker Hughes states that this job was the first 24-stage Frac-Point EX system deployment.

The system was deployed on the Ogden 11-3H well for Whiting Petroleum and allowed the single-trip isolation of 24 intervals with an 8,000-psi pressure rating, while achieving high frac rates through all the ball seats. Baker Hughes states that the achievement will lower operating costs for Whiting while enhancing completion performance.

According to Bob Bennett, president of Baker Hughes’ Baker Oil Tools product line, “Lowering operating costs and increasing completion performance are top priorities for operators, given our current market environment. We believe our new system, which builds on the success and reliability of Baker Hughes’ original Frac-Point system and sets a new standard for downhole tool providers, will meet our clients’ expectations in areas like the Bakken shale and Three Forks where demand is increasing for the number of stages on a single-trip openhole completion.”

Rick Ross, vice president of operations for Whiting Petroleum Corp. said, “As our ability to efficiently drill and complete longer horizontal laterals has increased, the need to increase the number of frac stages that can be pumped with a ball/sleeve system has become critically important to Whiting. Our relationship with Baker Hughes in North Dakota has resulted in the companies jointly pushing technology for more effective and efficient completions.”

楊寶劍 是全球石油網(wǎng)的高級技術(shù)編輯,在石油技術(shù)資訊行業(yè)有八年的學(xué)識和經(jīng)驗(yàn)。他源源不斷地提供石油行業(yè)全球最新的技術(shù)創(chuàng)新、研發(fā)成果、現(xiàn)場應(yīng)用情況等信息。如果你對“新技術(shù)新產(chǎn)品”的內(nèi)容有任何問題或建議,請聯(lián)系楊寶劍編輯 +86 10-58236512 Email:allenyo@zhenweiexpo.com 歡迎您提供手中的最新技術(shù)文章!
關(guān)鍵字: 貝克休斯 多段壓裂 
關(guān)于我們 | 會員服務(wù) | 電子樣本 | 郵件營銷 | 網(wǎng)站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2011 www.tolkopozitiv.com Inc All Rights Reserved 全球石油化工網(wǎng) 版權(quán)所有 京ICP證080561號
主站蜘蛛池模板: 美女被吸乳羞羞动漫| 一个人免费观看日本www视频| 荡乱妇3p疯狂伦交下载阅读| 成人黄页网站免费观看大全 | 亚洲视频综合网| 18gay台湾男同亚洲男同| 日韩美女视频网站| 四虎影8818| 99久久婷婷国产综合亚洲| 欧美―第一页―浮力影院| 国产在线五月综合婷婷| 中国特黄一级片| 污污视频免费看| 国产成人精品久久综合| 中文字幕无码精品亚洲资源网| 男人让女人桶爽30分钟| 成人激爽3d动漫网站在线| 亲密爱人之无限诱惑| 亚洲精品一二区| 手机看片国产免费永久| 国产乱码精品一区二区三| xxxxx免费| 欧美亚洲国产日韩| 四虎免费影院ww4164h| 99re免费视频| 日本熟妇人妻xxxxx人hd| 免费人成视频在线| 欧美高清一区二区三| 欧美人与zoxxxx视频| 国产久视频观看| 99在线热视频只有精品免费 | 国产精品免费精品自在线观看| 久久午夜无码鲁丝片午夜精品 | 成人精品一区二区三区校园激情| 亚洲香蕉免费有线视频| 国产一区二区三区夜色| 妞干网手机视频| 亚洲综合视频在线观看| 成人精品一区二区户外勾搭野战 | 国产精品亚洲综合一区在线观看 | 风间由美一区二区播放合集|