導航:全球石油化工網 >> 資訊頻道 >> 技術裝備

貝克休斯多段壓裂技術新應用(英)

[加入收藏][字號: ] [時間:2009-11-10 全球石油網 關注度:0]
摘要:簡介:貝克休斯最近宣布,利用其Frac-Point EX 多段壓裂系統在威廉森頁巖盆地成功進行了一次24段完井作業。該項目是球閥式隔離層帶項目中段數最多的項目之一。 Baker Hughes recently announced ...
簡介:貝克休斯最近宣布,利用其Frac-Point EX 多段壓裂系統在威廉森頁巖盆地成功進行了一次24段完井作業。該項目是球閥式隔離層帶項目中段數最多的項目之一。


Baker Hughes recently announced the successful running of a 24-stage completion in the Williston Basin of the Bakken shale using its Frac-Point EX multistage fracturing system (Frac-Point EX). The project represents one of the largest number of stages ever run using a ball/sleeve method for isolation.

The original Frac-Point system was designed to allow operators to pinpoint fluid placement and volume during openhole fracturing operations, while eliminating the costs and complexities of cementing and perforating. Deployed as a one-trip installation and set in place by applying hydraulic pressure, the cost-effective system provides openhole isolation between zones, zone lobes, or fault lines so that fracture fluid is delivered where needed to maximize its effect.

The Frac-Point EX extends the Frac-Point system’s capability to 24 stages. Baker Hughes states that this job was the first 24-stage Frac-Point EX system deployment.

The system was deployed on the Ogden 11-3H well for Whiting Petroleum and allowed the single-trip isolation of 24 intervals with an 8,000-psi pressure rating, while achieving high frac rates through all the ball seats. Baker Hughes states that the achievement will lower operating costs for Whiting while enhancing completion performance.

According to Bob Bennett, president of Baker Hughes’ Baker Oil Tools product line, “Lowering operating costs and increasing completion performance are top priorities for operators, given our current market environment. We believe our new system, which builds on the success and reliability of Baker Hughes’ original Frac-Point system and sets a new standard for downhole tool providers, will meet our clients’ expectations in areas like the Bakken shale and Three Forks where demand is increasing for the number of stages on a single-trip openhole completion.”

Rick Ross, vice president of operations for Whiting Petroleum Corp. said, “As our ability to efficiently drill and complete longer horizontal laterals has increased, the need to increase the number of frac stages that can be pumped with a ball/sleeve system has become critically important to Whiting. Our relationship with Baker Hughes in North Dakota has resulted in the companies jointly pushing technology for more effective and efficient completions.”

楊寶劍 是全球石油網的高級技術編輯,在石油技術資訊行業有八年的學識和經驗。他源源不斷地提供石油行業全球最新的技術創新、研發成果、現場應用情況等信息。如果你對“新技術新產品”的內容有任何問題或建議,請聯系楊寶劍編輯 +86 10-58236512 Email:[email protected] 歡迎您提供手中的最新技術文章!
關鍵字: 貝克休斯 多段壓裂 
關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2011 www.tolkopozitiv.com Inc All Rights Reserved 全球石油化工網 版權所有 京ICP證080561號
主站蜘蛛池模板: 成人嗯啊视频在线观看| 伊人影视在线观看日韩区| 精品久久久久国产免费| 女性无套免费网站在线看| 亚洲综合无码一区二区三区| 91在线手机精品免费观看| 欧美a级片在线观看| 国产人妖tscd合集| 中文字字幕码一二区| 用我的手指搅乱吧未增删翻译| 国产美女久久久| 久久精品国产亚洲AV麻豆网站| 能播放18xxx18女同| 天天躁日日躁狠狠躁性色AVQ| 亚洲欧美日韩在线观看播放| 日本aⅴ日本高清视频影片www| 日本高清天码一区在线播放| 和阿同居的日子hd中字| 99在线观看精品视频| 欧美XXXX黑人又粗又长精品| 国产丝袜第一页| free性泰国女人hd| 欧美三级在线观看播放| 国产乱人伦AV麻豆网| www夜夜操com| 欧美丝袜高跟鞋一区二区| 国产一卡二卡≡卡四卡免费乱码| juy639黑人教练君岛美绪| 欧美一级黄色片视频| 国产一级第一级毛片| jizzjizz之xxxx18| 欧洲多毛裸体XXXXX| 四虎免费大片aⅴ入口| 99爱在线视频| 日韩人妻潮喷中文在线视频| 动漫人物将机机桶机机网站 | 乱码一乱码二乱码三新区| 羞羞答答xxdd影院欧美| 欧美又大粗又爽又黄大片视频 | 久久精品九九亚洲精品| 精品久久久久成人码免费动漫|