導航:全球石油化工網 >> 資訊頻道 >> 技術裝備

貝克休斯多段壓裂技術新應用(英)

[加入收藏][字號: ] [時間:2009-11-10 全球石油網 關注度:0]
摘要:簡介:貝克休斯最近宣布,利用其Frac-Point EX 多段壓裂系統在威廉森頁巖盆地成功進行了一次24段完井作業。該項目是球閥式隔離層帶項目中段數最多的項目之一。 Baker Hughes recently announced ...
簡介:貝克休斯最近宣布,利用其Frac-Point EX 多段壓裂系統在威廉森頁巖盆地成功進行了一次24段完井作業。該項目是球閥式隔離層帶項目中段數最多的項目之一。


Baker Hughes recently announced the successful running of a 24-stage completion in the Williston Basin of the Bakken shale using its Frac-Point EX multistage fracturing system (Frac-Point EX). The project represents one of the largest number of stages ever run using a ball/sleeve method for isolation.

The original Frac-Point system was designed to allow operators to pinpoint fluid placement and volume during openhole fracturing operations, while eliminating the costs and complexities of cementing and perforating. Deployed as a one-trip installation and set in place by applying hydraulic pressure, the cost-effective system provides openhole isolation between zones, zone lobes, or fault lines so that fracture fluid is delivered where needed to maximize its effect.

The Frac-Point EX extends the Frac-Point system’s capability to 24 stages. Baker Hughes states that this job was the first 24-stage Frac-Point EX system deployment.

The system was deployed on the Ogden 11-3H well for Whiting Petroleum and allowed the single-trip isolation of 24 intervals with an 8,000-psi pressure rating, while achieving high frac rates through all the ball seats. Baker Hughes states that the achievement will lower operating costs for Whiting while enhancing completion performance.

According to Bob Bennett, president of Baker Hughes’ Baker Oil Tools product line, “Lowering operating costs and increasing completion performance are top priorities for operators, given our current market environment. We believe our new system, which builds on the success and reliability of Baker Hughes’ original Frac-Point system and sets a new standard for downhole tool providers, will meet our clients’ expectations in areas like the Bakken shale and Three Forks where demand is increasing for the number of stages on a single-trip openhole completion.”

Rick Ross, vice president of operations for Whiting Petroleum Corp. said, “As our ability to efficiently drill and complete longer horizontal laterals has increased, the need to increase the number of frac stages that can be pumped with a ball/sleeve system has become critically important to Whiting. Our relationship with Baker Hughes in North Dakota has resulted in the companies jointly pushing technology for more effective and efficient completions.”

楊寶劍 是全球石油網的高級技術編輯,在石油技術資訊行業有八年的學識和經驗。他源源不斷地提供石油行業全球最新的技術創新、研發成果、現場應用情況等信息。如果你對“新技術新產品”的內容有任何問題或建議,請聯系楊寶劍編輯 +86 10-58236512 Email:allenyo@zhenweiexpo.com 歡迎您提供手中的最新技術文章!
關鍵字: 貝克休斯 多段壓裂 
關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2011 www.tolkopozitiv.com Inc All Rights Reserved 全球石油化工網 版權所有 京ICP證080561號
主站蜘蛛池模板: reikokobayakawatube| 久久国产免费观看精品| 精品国产一区二区三区不卡| 国产精品成人无码视频| 一级特黄女**毛片| 日韩视频免费一区二区三区| 人善交video欧美| 草莓视频污在线观看| 国产精品国产色综合色| 一a一片一级一片啪啪| 日本黄色片在线播放| 亚洲欧美一区二区三区| 精品国产乱码一区二区三区| 国产成人免费A在线视频| 99re在线视频| 性护士movievideobest| 久久狠狠爱亚洲综合影院| 欧美黑人巨大xxxxx视频| 午夜精品福利在线观看| 97国产在线播放| 国产麻豆剧看黄在线观看| 三级伦理在线播放| 日本黄色动画片| 亚洲另类图片另类电影| 狠狠躁夜夜躁人人爽天天天天97| 国产一级做a爰片在线| 俄罗斯乱理伦片在线观看| 天堂网www最新版资源在线| 中文字幕第四页| 日韩欧美综合在线| 亚洲国产精品综合久久网各| 猛男狂搡美女免费| 嘿咻视频免费网站| 韩国午夜理论在线观看| 国产精品国色综合久久| 99国产成+人+综合+亚洲欧美| 性导航app精品视频| 久久一本岛在免费线观看2020| 最近中文字幕完整视频高清电影| 亚洲精品456在线播放| 目中无人在线观看免费高清完整电影 |