導航:全球石油化工網 >> 資訊頻道 >> 技術裝備

哈里伯頓公司的新式海上油氣工作船(英)

[加入收藏][字號: ] [時間:2009-02-05 Halliburton 關注度:0]
摘要:簡介:哈里伯頓公司推出新型海上工作船Stim Star Borneo,它是為在東南亞進行作業(yè)而設計的。它能進行各項增產措施,并能使用連續(xù)管進行修井作業(yè)。 Operators in Southeast Asia can now mo...
簡介:哈里伯頓公司推出新型海上工作船Stim Star Borneo,它是為在東南亞進行作業(yè)而設計的。它能進行各項增產措施,并能使用連續(xù)管進行修井作業(yè)。

Operators in Southeast Asia can now more readily implement Halliburton advanced stimulation and well intervention technologies. The new Stim Star Borneo vessel is a self propelled barge designed to work in the offshore oil and gas fields with the additional capability of servicing
wells in the rivers and deltas in Indonesia. 

The vessel is fully equipped to handle all phases of production stimulation including acidizing, acid fracturing, proppant fracturing, sand control and conformance treatments. In addition, the vessel is equipped to provide well intervention services using coiled tubing. 

Slickline and electric line capabilities can be readily added when required. 

At 200 ft length and 66 ft width, the Stim Star Borneo has an operating draft of 10.5 ft offshore and 9 ft in the delta areas. 

Above deck storage capacities consist of 5,200 gal acid, almost 4,400 gal additives and 350,000 lb proppant. 

Below deck capacities are almost 3,500 bbl of process and completion fluid and over 4,700 bbl of drill water. 

Maximum fracturing rate is 18 bbl/min with sand and 25 bbl/min with clean fluid.

Focused on Safety and Environmental Performance 

The Stim Star Borneo meets or exceeds the requirement of SOLAS and other regulatory bodies. In addition, the vessel is outfitted to provide environmentally sustainable operations. 

Advanced Technologies for Improved Well Performance 

The Stim Star Borneo serves as a platform that enables Halliburton specialists to reliably deliver key services. 

Reservoir Deliverability Solutions 

• Hydraulic fracturing
• Tight gas reservoir technologies
• Horizontal well fracturing
• Limited entry to bypass damage
• Near-wellbore damage removal
• Matrix acidizing
• Foamed acid
• Near-wellbore damage removal (cont’d)
• Scale removal (mechanical and chemical)
• Waterblock removal
• Horizontal well cleanup 

Conformance Solutions 

• Chemical water shut off
• Relative permeability modification 

Sand Control Solutions 

• New completions
• Fracpack
• High rate water pack
• Thru-tubing intervention
• Resin sand consolidation
• Thru-tubing gravel pack with coiled tubing 

Well Intervention Solutions – Coiled Tubing 

• Nitrogen services
• Fishing and milling
• Stimulation
• Sediment washing
• Logging 

InstaVis™ Mixing System 

The Stim Star Borneo is equipped with Halliburton’s proprietary InstaVis™ gel-on-the-fly system that uses a fully hydrated fracturing gel concentrate and provides important advantages: 

• Eliminates waiting for gel hydration.
• Enables almost instantaneous adjustments to help match fluid characteristics to formation parameters.
• Requires no waiting time to build additional fluid volume or change viscosity.
• Enables optimization of gel polymer loading during the treatment which can reduce the amount of polymer in the formation.

關鍵字: 修井船 哈里伯頓 
關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2011 www.tolkopozitiv.com Inc All Rights Reserved 全球石油化工網 版權所有 京ICP證080561號
主站蜘蛛池模板: 看大片全色黄大色黄| 男女交性永久免费视频播放| 国产日韩欧美视频二区| 99视频精品国在线视频艾草| 搡女人免费免费视频观看| 国产69久久精品成人看小说| 天天成人综合网| 在线播放国产一区二区三区| 三上悠亚大战黑人在线观看| 日韩免费观看视频| 亚洲人成伊人成综合网久久久| 色噜噜成人综合网站| 国产成人综合久久精品亚洲| 一个人免费观看www视频| 日本a∨在线播放高清| 亚洲精品在线视频观看| 精品国产乱码久久久久久1区2区| 国产你懂的在线观看| 国产喷水在线观看| 国产精品区一区二区三在线播放| 99自拍视频在线观看| 巨龙征母全文王雪琴笔趣阁| 中文字幕第一页国产| 日韩一区二区三区免费视频| 亚洲av永久无码嘿嘿嘿| 欧美性色黄大片在线观看| 亚洲精品国产情侣av在线| 男人肌肌捅女人肌肌视频| 刚下班坐公交车被高c怎么办| 色94色欧美一区| 国产乱子伦在线观看| 黄在线观看网站| 国产精品久久久久久福利| japanese六十路| 日韩大片免费看| 亚洲精品成人片在线播放| 男生和女生污污的视频| 制服丝袜第六页| 韩国太太的告白韩国电影| 国产性色视频在线高清| 99久在线精品99re6视频|