墨西哥灣深水水平井鉆井平臺起火沉沒事故

[加入收藏][字號: ] [時間:2010-05-27  來源:博研論壇  關注度:0]
摘要:   You may have heard the news in the last two days about the Deepwater Horizon drilling rig which caught fire, bur...


  You may have heard the news in the last two days about the Deepwater Horizon drilling rig which caught fire, burned for two days, thensank in 5,000 ft of water in the Gulf of Mexico.  There are still 11 men missing, and they are not expected to be found.  
The rig belongs to Transocean, the world’s biggest offshore drilling contractor.  The rig was originally contracted through the year 2013 to BP and was working on BP’s Macondo exploration well when the fire broke out.  The rig costs about $500,000 per day to contract.  The full drilling spread, with helicopters and support vessels and other services, will cost closer to $1,000,000 per day to operate in the course ofdrilling for oil and gas. The rig cost about $350,000,000 to build in 2001 and would cost at least double that to replace today.


Nautilus, being transported on a Heavy-Lift vessel


  The rig represents the cutting edge of drilling technology.  It is a floating rig, capable of working in up to 10,000 ft water depth.  The rig isnot moored; It does not use anchors because it would be too costly and too heavy to suspend this mooring load from the floatingstructure.  Rather, a triply-redundant computer system uses satellite positioning to control powerful thrusters that keep the rig on station within a few feet of its intended location, at all times. This is called Dynamic Positioning.
The rig had apparently just finished cementing steel casing in place at depths exceeding 18,000 ft.  The next operation was to suspend the well so that the rig could move to its next drilling location, the idea being that a rig would return to this well later in order to complete the work necessary to bring the well into production.
It is thought that somehow formation fluids – oil /gas – got into the wellbore and were undetected until it was too late to take action.  With a floating drilling rig setup, because it moves with the waves, currents, and winds, all of the main pressure control equipment sits on the seabed – the uppermost unmoving point in the well. This pressure control equipment – the Blowout Preventers, or ‘BOP’s” as they’re called, are controlled with redundant systems from the rig.  In the event of a serious emergency, there are multiple Panic Buttons to hit, and even fail-safe Deadman systems that should be automatically engaged when something of this proportion breaks out.  None of them were aparently activated, suggesting that the blowout was especially swift to escalate at the surface.  The flames were visible up to about 35 miles away.  Not the glow – the flames.  They were 200 – 300 ft high.
 

上一頁12345下一頁


          您的分享是我們前進最大的動力,謝謝!
關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2012 www.tolkopozitiv.com Inc All Rights Reserved 全球石油化工網 版權所有
京ICP證120803號 京ICP備05086866號-8 京公網安備110105018350
主站蜘蛛池模板: 焰灵姬下面夹得好紧| 久久国产精品久久久久久| 2020国产欧洲精品视频| 欧美性xxxxx极品娇小| 国产无遮挡无码视频免费软件| 久久狠狠色噜噜狠狠狠狠97| 老师你下面好湿好深视频 | 日本欧美韩国专区| 又爽又黄又无遮挡的视频| a级成人毛片免费视频高清| 欧美日韩国产综合在线| 国产成a人片在线观看视频下载| 中日韩欧美经典电影大全免费看| 精品久久久BBBB人妻| 国产精品酒店视频| 久久精品国产亚洲AV网站| 综合网中文字幕| 国产超清在线观看| 久久精品久久久久观看99水蜜桃| 精品视频一区二区三区在线播放 | 国产久视频观看| my1136蜜芽入口永不失联版| 欧美又大粗又爽又黄大片视频 | 亚洲五月丁香综合视频| 被催眠暴jian的冷艳美mtxt下载| 奷小罗莉在线观看国产| 亚洲免费在线看| 老熟女高潮一区二区三区| 国语自产偷拍精品视频偷| 久久精品人妻中文系列| 精品一区二区久久久久久久网站| 国产精品午夜福利在线观看地址| 久久99久久99精品免视看动漫| 爱情岛亚洲论坛福利站| 国产成人av一区二区三区在线观看 | 欧美日韩在线一区二区三区| 国产又粗又长又更又猛的视频| www成人国产在线观看网站| 樱桃视频高清免费观看在线播放| 啊灬啊别停灬用力啊动视频| 91中文字幕在线|