[英]Need Drives Advances

[加入收藏][字號: ] [時間:2011-06-08  來源:www.worldoil.com  關注度:0]
摘要: Pride International ultra-deepwater drillship Deep Ocean Clarion makes its way from South Korea to the US Gulf ...

 

As for the subsea equipment, Helix has an intervention riser system (IRS), which includes a 135⁄8-in., 10,000-psi connector. The IRS has a hydraulic cutting gate valve, a maximum bore diameter of 73⁄8 in. plus a well barrier and two spring-assist fail-safe-closed gate valves of the same size. Remotely controlling the IRS functions is a pilot-line hydraulic control system that was originally capable of operating in up to 5,600 ft of water; an upgrade to a multiplex control system and the use of 8,500 ft of electric cable and ½-in. hydraulic supply line have extended its reach to 8,000 ft.

 

The final piece of the Helix Fast Response System is the ROV-operable well cap, which is comprised of an 18¾-in., 10,000-psi hydraulic wellhead connector and a 135⁄8-in., 10,000-psi dual ram block with an 18¾-in., 10,000-psi mandrel (profile up). The cap has a 135⁄8-in. bore and 41⁄16-in., 10,000-psi side outlets with BX-155 seals. Flowrate and pressure can be regulated through two 33⁄16-in. vents.

 

MWCC. In July of last year, four operators came together to create MWCC as a non-profit organization to operate and maintain a rapid response system to capture and contain oil following a deepwater blowout. With ExxonMobil leading the way, Chevron, ConocoPhillips and Shell committed $1 billion to fund the initial costs of the system.

 

Since its inception, the company has grown to 10 members as Anadarko, Apache, BHP Billiton, BP, Hess and Statoil have joined. The member companies will each have access to the containment systems, but non-member firms will also have access to the systems through a service agreement and fees.

 

While Helix’s solution uses equipment that the company already uses for other tasks, MWCC is building its system around components that are strictly for use in oil containment situations. MWCC’s equipment is stored at various locations along the Gulf coast in Texas and Louisiana.

 

When BP joined MWCC in September, the operator made available to the consortium the equipment it used in containing the Macondo well. This equipment makes up part of MWCC’s interim containment system.



Fig. 3. The MWCC expanded containment system.

The dual-shutoff interim system is designed for use in water depths up to 8,000 ft. It has the capacity to contain 60,000 bpd of liquids and 120 MMcfd of gas, with potential for expansion. It includes a 15,000-psi single-ram capping stack and dispersant injection capability.

While the interim system is in place now, MWCC is working on an expanded system (Fig. 3), which is scheduled for launch in 2012. MWCC has contracted Technip to design dedicated subsea well containment equipment, including the containment assembly, manifold, control umbilicals, accumulator, dispersant injector, risers and flowlines.

When completed, the expanded system will be capable of operating in up to 10,000 ft of water with a 15,000-psi, three-ram stack and a dispersant injection system. It will have the capacity to contain 100,000 bpd of liquids and 200 MMcfd of gas, although using additional vessels could increase capacity.

The expanded system will have a new subsea containment assembly that will create a permanent connection and seal to prevent oil from escaping. The assembly, which is designed to prevent hydrates from forming, will have adapters and connectors so it can interact with the wellhead, BOP stack, lower marine riser package and/or casing and strings that are used by operators in the US Gulf.

Capture caisson assemblies will also be built to close off a damaged connector or leak that is outside the well casing. Once installed, the caisson will create a seal with the seabed to prevent seawater from entering.

Captured oil will flow through a flexible pipe to a riser assembly. If more than one capture vessel is required, a manifold will distribute oil from the subsea assembly to multiple riser assemblies. The risers and umbilicals will be able to quickly disconnect from capture vessels should they need to get out of the path of a hurricane.

The extended system will also include modular process equipment that will be installed on the capture vessels. The process equipment will separate oil from gas, flare the gas, and store oil until it can be offloaded to shuttle tankers.

Deployment of the system will begin within 24 hours of an incident. MWCC will make the equipment available to the incident operator, who is separately responsible for securing the required capture vessels. 

原文地址:http://www.worldoil.com/May-2011-Need-Drives-Advances.html

上一頁12345下一頁


          您的分享是我們前進最大的動力,謝謝!
關鍵字: Drilling Technology 
關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2012 www.tolkopozitiv.com Inc All Rights Reserved 全球石油化工網 版權所有
京ICP證120803號 京ICP備05086866號-8 京公網安備110105018350
主站蜘蛛池模板: 台湾三级全部播放| 在线观看日本中文字幕| 免费毛片a线观看| a级片视频网站| 欧美老熟妇欲乱高清视频| 国产精品国产三级国产AV主播| 国产伦精品一区二区三区精品| 中文字幕在线网站| 男女国产一级毛片| 国产精品爽黄69天堂a| 亚州av综合色区无码一区| 色综合欧美在线视频区| 好男人好资源在线观看免费播放高清 | 农村乱人伦一区二区| 99re热视频| 暖暖免费中国高清在线| 四虎国产永久在线观看| 99久久er这里只有精品18| 最新孕妇孕交视频| 国产日韩精品一区二区在线观看播放| 久久久久人妻一区精品| 篠田优在线播放| 国产精品乱子乱XXXX| 中文无码人妻有码人妻中文字幕| 男人把女人桶到爽| 天天夜碰日日摸日日澡| 亚洲免费在线观看| 美日韩在线视频| 国产精品视频观看| 久久久久久九九精品久小说 | 亚洲欧美7777| 青娱极品盛宴国产一区| 欧美黑人巨大xxxxxxxx| 国产在线精品一区二区夜色| 一个人看的www在线观看免费| 欧美亚洲国产精品久久高清| 四虎成年永久免费网站| 中国国产aa一级毛片| 欧美日韩一区二区综合| 国产69精品久久久久APP下载| 99v久久综合狠狠综合久久 |